-
Notifications
You must be signed in to change notification settings - Fork 14
Planned Reconstruction Algorithms
Janek Gröhl edited this page Jan 12, 2022
·
10 revisions
Algorithm name | Reference | Contact Person (for implementation) | Status |
---|---|---|---|
Back-projection | Xu and Wang, 2003 | Janek Gröhl | Done |
fnumber back-projection | Kalkhoran et al., 2015 | François Varray | Done |
pDAS back-projection | TODO | François Varray | Done |
SCF back-projection | Kalkhoran et al., 2015 | François Varray | Done |
PCF back-projection | Kalkhoran et al., 2015 | François Varray | Done |
Delay Multiply and Sum | TODO | Kris Dreher | Started |
signed Delay Multiply and Sum | TODO | Kris Dreher | Started |
FFT-based reconstruction | TODO | Mengjie Shi | Started |
FFT-based reconstruction | TODO | Jenni Poimala | Started |
Time reversal | TODO | Ben Cox | Planned |
SLSC back-projection | TODO | ? (Muyinatu Bell) | Planned |
Minimum Variance Beamforming | TODO | ? | Backlog |
Eigenspace Minimum Variance Beamforming | TODO | ? | Backlog |
SCF DMAS | TODO | ? | Backlog |
PCF DMAS | TODO | ? | Backlog |
Double-stage DMAS | TODO | ? | Backlog |
p-th root DMAS | TODO | ? | Backlog |