Umbrella tickets (or Epics in agile speak) are over arching tickets which contain multiple stages. Sometime you may feel it is beneficial for you or the reviewer to split a ticket which has been agreed in backlog prep into multiple smaller tickets; in this case you create an umbrella ticket.
- Create a smaller ticket it should be named -1:
- Estimate the ticket
- Assign the ticket to yourself
- Reference the ticket in the original ticket and reduce its estimate by the estimate of this ticket. If this makes the ticket negative by more than 1 then talk about it with a member of the team.
- Work on the ticket as if it were a normal ticket
- Inform Kevin that you have created an umbrella ticket so he can track the new tickets (this may not be necessary)
- Create the umbrella ticket with the original estimate of the ticket minus the estimate of the present ticket. If this makes the ticket negative by more than 1 then talk about it with a member of the team.
- Name this ticket the same as the original
- Rename the original tickets as -1:
- Set the estimate on the original ticket
- Spin out any new tickets as in case 1
- Inform Kevin that you have created an umbrella ticket so he can track the new tickets