Skip to content

chore(deps): renovate: astral-sh/ruff-pre-commit to v0.8.1 #1859

chore(deps): renovate: astral-sh/ruff-pre-commit to v0.8.1

chore(deps): renovate: astral-sh/ruff-pre-commit to v0.8.1 #1859

Triggered via pull request December 2, 2024 00:47
Status Failure
Total duration 44s
Artifacts

test.yml

on: pull_request
Matrix: test-template
Fit to window
Zoom out
Zoom in

Annotations

16 errors
test macos-latest py3.13
Process completed with exit code 1.
test macos-latest py3.11
Process completed with exit code 1.
test ubuntu-latest py3.11
The job was canceled because "macos-latest_3_13" failed.
test ubuntu-latest py3.11
Process completed with exit code 1.
test windows-latest py3.12
The job was canceled because "macos-latest_3_13" failed.
test windows-latest py3.12
The operation was canceled.
test windows-latest py3.11
The job was canceled because "macos-latest_3_13" failed.
test windows-latest py3.11
The operation was canceled.
test windows-latest py3.13
The job was canceled because "macos-latest_3_13" failed.
test windows-latest py3.13
The operation was canceled.
test macos-latest py3.12
The job was canceled because "macos-latest_3_13" failed.
test macos-latest py3.12
The operation was canceled.
test ubuntu-latest py3.12
The job was canceled because "macos-latest_3_13" failed.
test ubuntu-latest py3.12
The operation was canceled.
test ubuntu-latest py3.13
The job was canceled because "macos-latest_3_13" failed.
test ubuntu-latest py3.13
The operation was canceled.