Skip to content

Fix CI

Fix CI #11

Triggered via push January 24, 2025 06:21
Status Failure
Total duration 4m 18s
Artifacts

go.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

4 errors and 5 warnings
lint
issues found
Go 1.22
Process completed with exit code 1.
Go 1.23
The job was canceled because "_1_22" failed.
Go 1.23
The operation was canceled.
lint
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
lint: savepointers/savepointer.go#L9
redefines-builtin-id: redefinition of the built-in type string (revive)
lint: satomicx/querier_test.go#L69
unused-parameter: parameter 'qb' seems to be unused, consider removing or renaming it as _ (revive)
lint: querier_test.go#L342
unused-parameter: parameter 'qb' seems to be unused, consider removing or renaming it as _ (revive)
Go 1.22
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636