Skip to content

chore: upgrade validator to latest #30

chore: upgrade validator to latest

chore: upgrade validator to latest #30

Triggered via push December 14, 2024 06:21
Status Failure
Total duration 2m 48s
Artifacts

ci.yml

on: push
Matrix: build
Matrix: test
release
0s
release
Fit to window
Zoom out
Zoom in

Annotations

9 errors
build (1.70)
Process completed with exit code 101.
test (1.70)
Process completed with exit code 101.
test (stable)
The job was canceled because "_1_70" failed.
test (nightly)
The job was canceled because "_1_70" failed.
test (nightly)
The operation was canceled.
build (nightly)
The job was canceled because "_1_70" failed.
build (nightly)
The operation was canceled.
build (stable)
The job was canceled because "_1_70" failed.
build (stable)
The operation was canceled.