Skip to content

Celestia mainnet config (#1038) #4083

Celestia mainnet config (#1038)

Celestia mainnet config (#1038) #4083

Triggered via push February 28, 2025 16:54
Status Failure
Total duration 6h 0m 43s
Artifacts

checks-all.yml

on: push
Matrix: bridge-client-integration
Matrix: build
Matrix: core-resource-signer
Matrix: governed-gas-pool
Matrix: mcr
Matrix: move-modules-test
Matrix: movement-celestia-da-light-node
Matrix: movement-full-node-local
Matrix: movement-full-node-malicious
Matrix: movement-full-node-remote
Matrix: movement-indexer-local
Matrix: movement-multi-node-local
Matrix: solidity-bridge-tests
Matrix: unit-tests
Fit to window
Zoom out
Zoom in

Annotations

15 errors and 1 warning
solidity-bridge-tests (ubuntu-22.04, x86_64, buildjet-8vcpu-ubuntu-2204)
Process completed with exit code 1.
mcr (ubuntu-22.04, x86_64, buildjet-8vcpu-ubuntu-2204)
Process completed with exit code 101.
move-modules-test (ubuntu-24.04, x86_64, ubuntu-24.04)
Process completed with exit code 1.
movement-full-node-malicious (ubuntu-22.04, x86_64, buildjet-16vcpu-ubuntu-2204)
Process completed with exit code 101.
bridge-client-integration (ubuntu-24.04, x86_64, ubuntu-24.04)
The hosted runner: GitHub Actions 382 lost communication with the server. Anything in your workflow that terminates the runner process, starves it for CPU/Memory, or blocks its network access can cause this error.
unit-tests (macos-13-latest, arm64, macos-13-xlarge)
The job running on runner GitHub Actions 184 has exceeded the maximum execution time of 360 minutes.
unit-tests (macos-13-latest, arm64, macos-13-xlarge)
The operation was canceled.
core-resource-signer (ubuntu-22.04, x86_64, buildjet-16vcpu-ubuntu-2204)
The job running on runner buildjet.com_ee820d2c-a25a-466d-b27c-bd690797a11e has exceeded the maximum execution time of 360 minutes.
governed-gas-pool (ubuntu-22.04, x86_64, buildjet-16vcpu-ubuntu-2204)
The job running on runner buildjet.com_3c23d005-8519-42bf-b48b-e31aa59ed78c has exceeded the maximum execution time of 360 minutes.
governed-gas-pool (ubuntu-22.04, x86_64, buildjet-16vcpu-ubuntu-2204)
The operation was canceled.
movement-indexer-local (ubuntu-22.04, x86_64, buildjet-16vcpu-ubuntu-2204)
The job running on runner buildjet.com_5bd00df1-a6fd-4a08-9284-320160b7e529 has exceeded the maximum execution time of 360 minutes.
unit-tests (ubuntu-22.04, x86_64, buildjet-8vcpu-ubuntu-2204)
The job running on runner buildjet.com_d77b2620-fa9d-4fe8-97e5-33808391c0fc has exceeded the maximum execution time of 360 minutes.
unit-tests (ubuntu-22.04, x86_64, buildjet-8vcpu-ubuntu-2204)
The operation was canceled.
bridge-client-integration (ubuntu-24.04, x86_64, ubuntu-24.04)
You are running out of disk space. The runner will stop working when the machine runs out of disk space. Free space left: 95 MB