Skip to content

merge main and resolve conflicts #4139

merge main and resolve conflicts

merge main and resolve conflicts #4139

Triggered via push March 4, 2025 20:57
Status Failure
Total duration 3h 18m 8s
Artifacts

checks-all.yml

on: push
Matrix: bridge-client-integration
Matrix: build
Matrix: core-resource-signer
Matrix: governed-gas-pool
Matrix: mcr
Matrix: move-modules-test
Matrix: movement-celestia-da-light-node
Matrix: movement-elsa-to-biarritz-rc1-bring-up
Matrix: movement-full-node-local
Matrix: movement-full-node-malicious
Matrix: movement-full-node-remote
Matrix: movement-indexer-local
Matrix: movement-multi-node-local
Matrix: solidity-bridge-tests
Matrix: unit-tests
Fit to window
Zoom out
Zoom in

Annotations

3 errors
unit-tests (ubuntu-22.04, x86_64, buildjet-8vcpu-ubuntu-2204)
The self-hosted runner: buildjet.com_b5d25400-04d6-42f1-8491-486724178125 lost communication with the server. Verify the machine is running and has a healthy network connection. Anything in your workflow that terminates the runner process, starves it for CPU/Memory, or blocks its network access can cause this error.
unit-tests (macos-13-latest, arm64, macos-13-xlarge)
The job was canceled because "ubuntu-22_04_x86_64_build" failed.
unit-tests (macos-13-latest, arm64, macos-13-xlarge)
The operation was canceled.