Skip to content

Bump github.com/stretchr/testify from 1.8.4 to 1.9.0 in /examples/go-gotestsum #1622

Bump github.com/stretchr/testify from 1.8.4 to 1.9.0 in /examples/go-gotestsum

Bump github.com/stretchr/testify from 1.8.4 to 1.9.0 in /examples/go-gotestsum #1622

Status Failure
Total duration 2m 49s
Artifacts

go.yml

on: pull_request
Matrix: build

Annotations

5 errors
build (ubuntu-latest)
Process completed with exit code 2.
build (windows-latest)
The job was canceled because "ubuntu-latest" failed.
build (windows-latest)
The operation was canceled.
build (macos-latest)
The job was canceled because "ubuntu-latest" failed.
build (macos-latest)
The operation was canceled.