Skip to content

Commit

Permalink
updates nozzle-rack-asm docs + staging plate QC
Browse files Browse the repository at this point in the history
  • Loading branch information
lucian151 committed Jan 23, 2025
1 parent 1019895 commit 9135a37
Show file tree
Hide file tree
Showing 2 changed files with 8 additions and 7 deletions.
8 changes: 4 additions & 4 deletions docs/lumen/additional-parts/index.md
Original file line number Diff line number Diff line change
Expand Up @@ -12,7 +12,7 @@ These parts and their respective quantities are as follows:
- 1x `y-limit-striker`
- 1x `static-camera-foot`
- 1x `aux-staging-plate-foot`
- 1x `nozzle-rack`
- 1x `nozzle-rack-asm`

## Work Instructions

Expand Down Expand Up @@ -84,7 +84,7 @@ These parts and their respective quantities are as follows:
- Place each `aux-staging-plate-foot` into a <span style="background-color:yellow"> yellow NEEDS QC bin</span> while it awaits inspection
![](img/aux-staging-plate-foot-bin.png)

### nozzle-rack
### nozzle-rack-asm

- Insert 2x `m3-hex-head-bolt` into the left and right outermost slots on `nozzle-rack`

Expand All @@ -102,9 +102,9 @@ These parts and their respective quantities are as follows:

<img src="img/image18.jpg" width="60%"/>

- Place the completed `nozzle-rack` into a `2x3-bag` before sealing it shut
- Place the completed `nozzle-rack` into a `3x4-bag` before sealing it shut to create `nozzle-rack-asm`

![alt text](img/bag-nozzle-rack-1.JPG)
![alt text](img/bag-nozzle-rack-2.JPG)

- Place the completed `nozzle-rack` assemblies in a bin on the packout shelf while they await future use
- Place the completed `nozzle-rack-asm` assemblies in a bin on the packout shelf while they await future use
7 changes: 4 additions & 3 deletions docs/lumen/pack-out/index.md
Original file line number Diff line number Diff line change
Expand Up @@ -6,7 +6,7 @@
* `y-gantry-left`
* `y-gantry-right`
* `x-gantry`
* `nozzle-rack`
* `nozzle-rack-asm`
* `getting-started-kit`
* `tool-kit-bag`
* `feeder-blade-harness-set`
Expand Down Expand Up @@ -161,8 +161,8 @@

![alt text](img/IMG_35.JPG)

### `front-leg-extension` and `nozzle-rack`
1. Insert `nozzle-rack` into the bottom right pocket
### `front-leg-extension` and `nozzle-rack-asm`
1. Insert `nozzle-rack-asm` into the bottom right pocket
* Confirm `nozzle-rack` has all its mounting hardware installed by peering through the bag

![alt text](img/IMG_36.JPG)
Expand Down Expand Up @@ -216,6 +216,7 @@ Confirm the `lower-foam-tray` matches the image shown below before continuing:
* `bottom-camera-assembly` (with lens cap removed)
* 3x `peek-cable-clamp`
* `bottom-light-harness` and `bottom-camera-harness` w/propper cable managment
* Ensure that the `bottom-camera-harness` was used and NOT the longer `top-cable-harness`
* `peek-cable-clamp` usage and rubber-band for securing loose cables

![alt text](img/IMG_49.JPG)
Expand Down

0 comments on commit 9135a37

Please sign in to comment.