Skip to content

Commit

Permalink
Adds check for top-ring-light to x-gantry QC
Browse files Browse the repository at this point in the history
* `top-ring-light` is present with the wire connector visible
  • Loading branch information
lucian151 committed Feb 20, 2025
1 parent 18786ff commit 916a49f
Show file tree
Hide file tree
Showing 2 changed files with 2 additions and 1 deletion.
2 changes: 1 addition & 1 deletion docs/lumen/pack-out/index.md
Original file line number Diff line number Diff line change
Expand Up @@ -88,7 +88,7 @@
* `GT2-belt` lays flat and is roughly centered in `alu-extrusion` channel
* `GT2-belt` has been correctly tensioned
* `x-gantry-toolhead` moves smoothly when actuated back and forth by hand

* `top-ring-light` is present with the wire connector visible
!!!success "If all checks pass, continue onward"

* Package `x-gantry` into `lower-foam-tray`
Expand Down
1 change: 1 addition & 0 deletions docs/lumen/x-gantry/index.md
Original file line number Diff line number Diff line change
Expand Up @@ -460,6 +460,7 @@ Inspect the completed `x-gantry` for the following criteria:

* `GT2-belt` has been trimmed to appropriate length (flush on 1 side, 15mm on the other)
* `Top-light-mount` is attached with two screws
* `top-ring-light` is present with the wire connector visible
* Camera lens cap is present
* The wire connectors on both `NEMA-11-stepper-motor` units face away from each other, sitting adjacent to their respective cable strain relief points
* Each `nozzle-holder` has been lubricated and fit-tested with a nozzle
Expand Down

0 comments on commit 916a49f

Please sign in to comment.