Skip to content

Commit

Permalink
Updates drag chain docs
Browse files Browse the repository at this point in the history
  • Loading branch information
lucian151 committed Sep 19, 2024
1 parent 464f0ff commit b8b4134
Show file tree
Hide file tree
Showing 2 changed files with 13 additions and 11 deletions.
3 changes: 3 additions & 0 deletions docs/lumen/drag-chain/img/x-harness-qc.png
Loading
Sorry, something went wrong. Reload?
Sorry, we cannot display this file.
Sorry, this file is invalid so it cannot be displayed.
21 changes: 10 additions & 11 deletions docs/lumen/drag-chain/index.md
Original file line number Diff line number Diff line change
Expand Up @@ -97,21 +97,20 @@ Inspect the cables for any loose crimps, reworking as needed, before continuing

## OQC Checks ##

* Inspect the *x-gantry side* of `drag-chain` and confirm the following cables are present and installed in the correct direction
* Inspect the *cable-splay* side of `drag-chain` and confirm the following cables are present and installed in the correct direction

!!!info "A quick way to tell which side of the `drag-chain` is the *x-gantry side*: it is the side where the cables are shorter exiting the `drag-chain`"
* `LM` cable: 6-pin connector with a <span style="background-color:red">**red**</span>`LM` label
* `RM` cable: 6-pin connector with a <span style="background-color:blue">**blue**</span> `RM` label

* `LM` cable: 6-pin connector with `LM` label
* `RM` cable: 6-pin connector with `RM` label
* `ZM` cable: 6-pin connector with **NO** label
* `ZL` cable: 3-pin connector with **NO** label
* `DL` cable: 3-pin connector with **NO** label, exits `drag-chain` between end-link and final cover
* `USB` cable: 4-pin connector with **NO** label, exits `drag-chain` between end-link and final cover

* Inspect the `drag-chain` and confirm the following tubes are present and labeled correctly on both sides
* Confirm the following vacuum tubes are present at both ends:
* <span style="background-color:red">**Red**</span> `4mm-pneumatic-tubing`
* <span style="background-color:blue">**Blue**</span> `4mm-pneumatic-tubing`

* Confirm no vacuum tubes are pinched closed by the rubber banding
* Confirm 3x `zip-tie` used in `cable-splay` are trimmed flush and present
* Confirm presence of `top-camera-cable`
* Confirm presence of `x-harness` and double check that `x-harness` has the correct orientation

![alt text](img/x-harness-qc.png)

!!!success "If all checks pass, place the completed `drag-chain` into a <span style="background-color:yellow"> yellow NEEDS QC bin</span> found on the pack-out shelf while it awaits peer-review"
!!!success "If all checks pass, place the completed `drag-chain` into a <span style="background-color:yellow"> yellow NEEDS QC bin</span> found on the pack-out shelf while it awaits Buddy review"

0 comments on commit b8b4134

Please sign in to comment.