Skip to content

Add in IRIDA Next updates Pipeline Best Practices #21

Add in IRIDA Next updates Pipeline Best Practices

Add in IRIDA Next updates Pipeline Best Practices #21

Triggered via pull request January 16, 2025 21:07
Status Failure
Total duration 5m 55s
Artifacts

ci.yml

on: pull_request
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

7 errors and 1 warning
Run pipeline with test data (23.10.1 | test | docker)
Process completed with exit code 1.
Run pipeline with test data (latest-everything | test | docker)
The job was canceled because "_23_10_1_test" failed.
Run pipeline with test data (latest-everything | test | docker)
The operation was canceled.
Run pipeline with test data (latest-everything | test_full | docker)
The job was canceled because "_23_10_1_test" failed.
Run pipeline with test data (latest-everything | test_full | docker)
The operation was canceled.
Run pipeline with test data (23.10.1 | test_full | docker)
The job was canceled because "_23_10_1_test" failed.
Run pipeline with test data (23.10.1 | test_full | docker)
The operation was canceled.
Run pipeline with test data (23.10.1 | test | docker)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636