Skip to content

Add Myst (new tech stack) workflow #61

Add Myst (new tech stack) workflow

Add Myst (new tech stack) workflow #61

Triggered via pull request May 14, 2025 23:11
@rossbarrossbar
synchronize #50
rossbar:myst
Status Cancelled
Total duration 1m 39s
Artifacts

ci.yml

on: pull_request
Build static site with tox
43s
Build static site with tox
Build static site with pixi
29s
Build static site with pixi
Build and execute static site with myst
45s
Build and execute static site with myst
Matrix: pixi_test
Matrix: tox_test
Fit to window
Zoom out
Zoom in

Annotations

6 errors
tox on windows-latest with Python 3.12
Canceling since a higher priority waiting request for 'Test-refs/pull/50/merge' exists
tox on windows-latest with Python 3.12
The operation was canceled.
pixi on windows-latest with py311
Canceling since a higher priority waiting request for 'Test-refs/pull/50/merge' exists
pixi on windows-latest with py311
The operation was canceled.
pixi on windows-latest with py312
Canceling since a higher priority waiting request for 'Test-refs/pull/50/merge' exists
pixi on windows-latest with py312
The operation was canceled.